After years of quoting against other shops — and inheriting jobs that went wrong — at Indumor we have a clear ranking of the mistakes that cost buyers the most money. Here are the 7, each with its antidote.
A poorly optimized structure weighs 20% extra: a cheap rate on inflated weight is expensive. Demand an open takeoff: weights, processes and prices in sight.
"We will sort the paint later" ends in surcharges or impossible galvanizing (a field-welded structure does not galvanize well). The finish is decided with the design.
"Something like this" produces quotes you cannot compare between vendors, and surprises later. A dimensioned sketch already puts everything in order.
Many "fabricators" subcontract cutting, machining or paint: every interface is delay and crossed excuses. Ask which processes happen inside the shop.
The part that arrives wrong at site costs triple to fix there. Require critical dimensions verified and documented before dispatch — non-negotiable for export orders.
"30 days" with no breakdown is wishful thinking. Ask for the stage-by-stage timeline: engineering, materials, fabrication, finishing.
For simple parts, price rules. For calculated structures, machined assemblies or jobs with installation, the cheapest vendor without technical capacity is the most expensive in the end.
Add us to the comparison: open quoting and committed dates.