Frequently asked questions

134 answers to what we get asked most: how to request a quote, how long a job takes, how it ships, what materials and codes we use, buying from Argentina, and the specifics of structures, tanks, dryers, mining and oil and gas. If your question is not here, ask us directly at the bottom of the page.

The company and the plant

A steel fabrication plant in Córdoba, Argentina, building steel structures, tanks, industrial dryers and custom parts for heavy industry: mining, oil and gas, agriculture, food and industrial construction. The whole process happens in our own plant: engineering, cutting, bending, rolling, welding, machining and coating.
Yes. Industrias Moreno is now Indumor: same plant, same team, same contact details.
At Av. Sabattini 5337, Córdoba, Argentina, on the Route 9 South industrial corridor, in the productive heart of the province. Our about us page shows the plant on satellite view and Street View.
7,500 m² (about 80,000 sq ft) under roof and 11,500 m² (about 120,000 sq ft) of yard, with capacity for 150 workers per shift and more than 25,000 labor-hours a week.
High-definition fiber laser cutting, CNC press brakes, plate and pipe rolling, MIG, TIG, stick and submerged arc welding, CNC turning and milling with a machining center, blasting and painting, assembly and testing. Critical processes stay under one roof, with no outsourcing.
Mining, oil and gas, agriculture, food and beverage, industrial construction, energy, marine and machinery builders. The Steel Knowledge Hub has guides for each sector.
Both: from a single custom part to full series production, with welding fixtures and CNC programs that keep every unit identical.
Yes, by arrangement in advance. It is the best way to see how we work before a large project.
Yes. If you sell engineering to companies, with or without the fabrication, you can build in our plant and follow every stage at the machine, with an office to receive your clients. See Partner with your engineering.
Yes. Your engineer checks the cutting, signs off the tack-welded assembly and approves before painting or shipping; our shop foreman runs the people, the machines and safety. More on Partner with your engineering.
Yes: our free Engineering Suite (currently in Spanish) has calculators for vertical and horizontal tanks, saddles, legs, lifting lugs, eyebolts, built-up beams, plate and bend development, bar nesting and steel buildings.

Quotes and purchasing

Through the quote form, by WhatsApp at +54 9 351 819 7432 or by email at [email protected]. Send drawings or a description of the job and we reply with price and lead time the same business day.
Drawings or a sketch, material, quantities, required finish, target date and delivery location. Tanks and dryers need some specific data, listed on our fuel storage tanks and rotary dryers pages.
PDF, DWG or DXF, and 3D models in STEP. If you have no drawing yet, a dimensioned sketch or photos with measurements are enough to start.
No, quoting is free. If a project needs significant up-front engineering, such as designing something that does not exist yet, we tell you before we start.
The same business day. We reply within four business hours, Monday to Friday from 7:30 am to 4:30 pm Argentina time (UTC−3), counted from when we receive the drawing, a sketch or the dimensions; what comes in late in the afternoon goes out the next morning. For a large project, or when something is still undefined, within that time you get a budgetary estimate and the list of what we need for a firm quote.
Yes. We fabricate in our own plant in Córdoba, Argentina, and quote direct, with no middlemen. We do not publish a price list because every job is priced from its own dimensions and from the steel price of the day: ask for a quote and you will have it the same business day.
A budget estimate helps evaluate a project while specifications are still missing; a firm offer commits price and lead time on defined data. We explain it in feasibility-stage budgets.
They are agreed per quote. On large projects the usual structure is an advance with the purchase order, payments against partial deliveries and a balance against final delivery and documentation.
Yes. We quote against technical specifications, tender documents and engineering lists, and put our assumptions and deviations in writing so the comparison is fair.
Check that both include the same things: material, thicknesses, finish, testing, documentation, freight and erection. Two identical totals can describe different jobs. More tips in how to request a fabrication quote and 7 mistakes when hiring a steel fabricator.
The validity period is stated on each quote. Since steel prices move, it is worth reconfirming before issuing a purchase order if some time has passed.

Buying from Argentina

Yes. We fabricate in Córdoba, Argentina and ship worldwide, with export-ready packaging and the commercial documentation your import requires. Argentine manufacturing costs make our pricing very competitive.
Yes. International quotes are issued in US dollars.
Yes. We work to the codes your engineering specifies, such as AWS D1.1, AISC, ASME and API, and read drawings in imperial or metric units.
Parts and modules ship in containers or on flat racks through Argentine ports, packed for the trip. Delivery terms are defined in each quote.
The commercial documents for export, plus the quality package your project requires: material certificates, welding procedures and qualifications, test reports and coating reports.
Yes. Third-party inspection and witness points are agreed in the inspection and test plan before fabrication starts, and video calls from the shop floor can be arranged.
English and Spanish: drawings, quotes, reports and day-to-day communication.
Competitive labor and overhead costs, a full in-house process chain and engineers used to working to international codes. We explain the case in why US companies outsource fabrication to Argentina.

Lead times, delivery and logistics

It depends on the job: cut and bent parts can ship in days; structures and tanks, in weeks; large projects, on a staged schedule. Lead time is committed in the quote. More in steel fabrication lead times.
Yes. On large projects we build a delivery schedule around the construction program, so what is erected first arrives first.
Breakdown is planned from the design stage: modules that fit a truck or container, bolted field connections and, when needed, permitted wide loads. See moving oversize steel.
Tanks up to about 4.5 meters (around 15 ft) in diameter can travel assembled as permitted wide loads within Argentina; larger ones are erected on site. Often the real limit is the access road.
Yes. Córdoba is one to two truck-days from the mining districts of western and northern Argentina and from the Neuquén oil fields. See logistics from Córdoba.
Yes. Erection and commissioning are coordinated per project and defined in the quote.
Yes. The standard delivery point is our plant, with loading onto your truck included.

Materials and processes

Carbon steel (ASTM A36 and other structural grades), AISI 304 and 316 stainless steel, aluminum, galvanized steel and abrasion-resistant plate. Ask us about specific materials or grades.
Yes. We cut from your drawings or CAD files with high precision, for a single part or a full production run. See laser cutting and our laser cutting guide.
Laser gives the best precision in thin and medium plate; plasma is fast in medium thicknesses; oxyfuel handles very thick plate. Full comparison in laser, plasma or oxyfuel.
They depend on thickness, length and geometry. Mark the critical dimensions on the drawing. See CNC bending tolerances and cutting and bending.
Yes: plate rolling for shell courses, tanks, hoppers and ducts, and pipe bending. See plate rolling and pipe rolling.
MIG, TIG, stick and submerged arc, depending on material, thickness and position. When each fits is in MIG, TIG or stick; the service is welding.
Yes: CNC turning, milling and a machining center, for standalone parts or to complete welded assemblies. See CNC machining.
Blasting and painting with epoxy and polyurethane systems, hot-dip galvanizing coordinated with galvanizers, and pickling and passivation for stainless. See paint, galvanizing or epoxy.
Both. We fabricate to your drawings, or we produce the detail engineering: shop drawings, calculations and bill of materials.
Yes: thick rolled and welded plate for tanks, hoppers, chutes, ducts, vessels and process equipment. See what is plate work.
Yes. When a rolled section is not enough or not available, we build welded I-sections to size. See welded plate girders.
It depends on the environment, what the steel touches and the maintenance you can do. Compared in carbon, stainless or galvanized.

Quality, codes and documentation

Stage by stage: certified raw material, dimensional checks, welding to qualified procedures, nondestructive testing where required and coating thickness measurement. Everything is recorded in reports.
Yes, mill certificates for plate and sections, with heat traceability when the project requires it.
The quality package that travels with a piece of equipment: as-built drawings, material certificates, welding procedures and qualifications, test and coating reports. See the quality dossier.
Yes, with procedures and welders qualified to the code the project calls for, for example AWS D1.1 for structures or ASME IX for vessels.
Depending on the equipment: radiography, dye penetrant, vacuum box on tank bottoms, hydrostatic and tightness tests, and any other tests in the specification, reported by a qualified NDT technician. See X-ray and dye penetrant.
In Argentina, the CIRSOC regulations: CIRSOC 301 for steel structures plus the load, wind and seismic codes. For projects abroad we work to the codes your engineering specifies, such as AISC and AWS.
We design to API 650 guidelines for vertical tanks with fully supported bottoms, UL 142 guidelines for shop-built tanks and API 12F guidelines for oilfield tanks; pressure vessels to ASME VIII.
We build to UL 142 construction guidelines and document it in each tank’s report. A UL listing is a mark issued by the US laboratory; if your project requires it contractually, we discuss it in the quote.
Yes. Warranty terms are defined in each quote according to the type of work and cover fabrication defects.

Steel structures

Industrial buildings and warehouses, crane runway structures, platforms, stairs and walkways, equipment and pipe supports, pipe racks, mezzanines and enclosures. See industrial steel structures.
Welded usually saves material; bolted erects faster and can be dismantled. Compared in welded vs bolted buildings.
Yes, with calculations to the applicable codes, or we fabricate to your engineer’s design.
With a takeoff by section type and weight per meter. Step by step in estimating steel weight.
Guardrails, toe boards, slip-resistant decking, safe access and the right load rating. See industrial platforms and stairs and railings.
Yes: columns, runway girders and brackets designed for the crane and its duty. See crane runway structures.
Yes, to add floor space without civil works. See steel mezzanines.
Yes, for ground-mounted parks and industrial roofs. See solar panel structures.
Periodic inspection of coatings, connections and bearings, and timely touch-ups. See steel structure maintenance.
We explain it in how to read structural drawings: views, sections, members, connections and notes.
Yes: sliding, swing and overhead. Which to choose is in industrial gate types.

Catalog products

Hoppers, transfer chutes, equipment skids, pipe racks, dryers, tanks, mezzanines, solar mounting structures, conveyor structures, crane runways, guardrails, toe boards, fixed ladders, cyclones, baghouse filters and centrifugal fans, among others. They are all in the product catalog.
They have reference sizes and configurations, but almost none comes out the same way twice: the material in a hopper, the load on a mezzanine or the equipment on a skid change the design. The catalog is the starting point.
With the “Quote” button on each page: the form opens with the product already in the subject, so you only add sizes and quantities. Or by email.
Under OSHA 1910.29, a 42 in top rail, plus or minus 3 in, with a midrail and a toeboard of at least 3.5 in. API 650 uses the same 42 in on tank platforms. See industrial guardrails.
Yes: we roll round or square tube up to 4 in for tank roofs, spiral stairs and circular platforms, with a constant radius. See curved guardrails.
OSHA requires at least 3.5 in, with no more than 1/4 in of clearance above the deck; ISO 14122-3, 100 mm. See steel toe boards.
Yes, for new and in-service tanks: roof perimeter, spiral stair and walkways, fixed to the top angle or onto reinforcing pads, never straight onto the roof plate. See tank guardrails.
Under OSHA, when it extends more than 24 ft; on ladders installed since November 19, 2018, it has to be a ladder safety system or personal fall arrest. See fixed ladders.
Receiving, surge and discharge hoppers for grain, flour, pellets and ore, in carbon or stainless steel, with the wall angle and outlet each material calls for. See industrial hoppers.
Because of walls too flat for the material, corners where it builds up or too small a cross-section. It is solved at the design stage, as with a hopper. See transfer chutes.
The frame with machined pads, engineered lifting points, piping supports and a finish suited to the destination; shop-built piping on request. The equipment is mounted by the owner or integrator. See equipment skids.
Between 20 and 25 %, so lines can be added in expansions without building another rack. See pipe racks.
Whatever it is designed for: as a reference, 60 to 100 psf for light storage, 60 to 80 for offices and 100 to 200+ psf for archives and heavy shelving. See steel mezzanine floors.
Yes, hot-dip galvanized, with CNC-cut parts and shipped as labeled kits for fully bolted assembly. See solar mounting structures.
Yes: trestles, truss and gallery sections, transfer towers and walkways, surveyed while the belt runs and built in modules to swap during the shutdown. See conveyor structures.
Yes: runway girders, brackets, columns, bracing and end stops, for new or existing buildings. The crane itself comes from its manufacturer; we build the runway. See crane runway structures.

Tanks

Fuel tanks, shop-built and large verticals; industrial tanks for water, oils and process; stainless tanks; oilfield tanks; and hydropneumatic vessels. See fuel storage tanks and steel tanks.
Shop-built tanks from 400 to 16,000 gallons (1,500 to 60,000 liters), horizontal or vertical, and vertical tanks from 13,000 to over 130,000 gallons (50 to 500+ m³), assembled in our plant or on site.
The volatility of the product: gasoline demands more care with venting, grounding and spacing. See diesel vs gasoline tanks.
Aboveground is simpler to inspect and maintain; underground saves space but needs more controls. See aboveground or underground.
It depends on consumption, refill frequency and the reserve you want. We do the math in fuel tank sizes.
Both contain spills: double wall takes less space, and a 110% dike is cheaper and simpler to inspect. See dikes or double wall.
Argentina’s Resolution SE 277/2025 created a national registry of aboveground hydrocarbon tanks for tanks over 50 m³ or sites holding 100 m³. See Argentina fuel tank regulations.
The US standard for welded vertical storage tanks with fully supported bottoms. See API 650 explained.
The standard for shop-built steel tanks for flammable and combustible liquids. See UL 142 explained.
Depending on type: seam radiography, dye penetrant on nozzles, vacuum box on the bottom and a tightness or hydrostatic test, all documented in the delivery report.
Stainless costs more up front but is never painted or lined; painted carbon steel is the logical choice for oils and fuels. See how much more stainless costs.
For demanding environments, a system of about 250 microns: Sa 2½ blasting, zinc-rich epoxy, epoxy and polyurethane. See tank coatings for mining.
API 653 sets periodic external and internal inspections, with intervals based on measured corrosion. See API 653 inspection.
Yes, pressure vessels designed to ASME VIII and hydrostatically tested.
Potable and process water, hydropneumatic tanks, lubricants, used oil and coolant, diesel and more. The typical list is in the tanks of a mine.
Yes: foundations and saddles, erection, piping to the dispensing point, stairs and platforms, and the final tightness test on site.

Industrial dryers

Rotary dryers and tunnel dryers, truck-and-tray or continuous belt, in stainless or carbon steel, thermally insulated. See rotary dryers and tunnel dryers.
If the product can take tumbling — minerals, sand, biomass, bulk ingredients — rotary; if it must keep its shape — fruit, vegetables, pasta, extruded feed — tunnel. See how to choose.
Minerals and sand, biomass, feed ingredients, extruded feed, fruit, vegetables, yerba mate, pasta and more. Each has its own guide in the industries section.
Natural gas, LPG, diesel, biomass, firewood or pellets. The comparison with heating values is in fuels and insulation.
Because a bare drum loses a lot of heat: on a 2 × 12 m drum at 150 °C, insulation can save more than 100,000 m³ of natural gas a year. It also protects people and steadies the process.
Direct firing for minerals and fuel biomass; a heat exchanger for food, feed and anything sensitive to smoke. See biomass furnaces.
Carbon steel with wear plate for abrasive duty; AISI 304 or 316 stainless for food, salts and corrosive products.
It is sized by the water to evaporate: ten tonnes per hour of sand entering at 6% moisture and leaving at 0.5% means evaporating about 550 kg of water per hour. Everything else follows from that number.
The product and its particle size, hourly or daily throughput, inlet and outlet moisture, the maximum temperature it tolerates, available fuel and space.
From minutes in a rotary mineral dryer to 16 to 24 hours for prunes in a tunnel. The equipment is sized for that time.
Yes, the rotary dryer is the most common in sand plants. See frac sand drying.
Yes: rotating zapecado drums, belt dryers and biomass furnaces. See yerba mate drying.
Yes, truck-and-tray and belt, with a heat exchanger so smoke never touches the fruit. See fruit and vegetable tunnel drying.
We build it complete at our plant and ship it in modules ready to erect; erection and commissioning are defined in the quote.

Dust collection

Yes: hoods, ductwork, cyclones, baghouse filters, fans and the structures that carry them, engineered as one system. We also build each part separately. See industrial dust collection systems.
A cyclone separates coarse dust well and needs almost no maintenance; a baghouse also catches the fine dust. For fine dust, welding fume or wherever an emission limit applies, the filter goes in, often with a cyclone ahead of it as a pre-cleaner. We explain it in cyclone or baghouse.
Yes: our Engineering Suite has free calculators (in Spanish) for cyclones (dimensions, efficiency by particle size and pressure drop), baghouses (bags, tube sheet and compressed air) and centrifugal fans (power and motor horsepower). It is a preliminary sizing: the final design is reviewed by a responsible engineer.

Mining, oil and gas

Yes: plant structures, hoppers, chutes, conveyors, tanks, maintenance platforms and camp structures. See the mining section.
With registrations, quality and safety documentation and a technical presentation to the mining company. See becoming a mining supplier.
Skids, pipe racks, tanks, platforms, tubular racks and structures for sand plants and surface facilities. See Vaca Muerta and the oil and gas section.
Argentina’s large investment incentive regime, which gives stability and benefits to big projects and expects part of their purchasing to go to local suppliers. See the RIGI for suppliers.
Yes. Above 4,000 meters, materials, connections, coatings and logistics all change. See fabricating for high-altitude mining.
Yes, in abrasion-resistant plate with replaceable liners. See chutes and wear liners.
Yes: frames carrying equipment, piping and instruments, tested in the shop. See oil and gas skids.
Yes, in modules designed for transport and erection. See pipe racks.
Yes, by fabricating in advance everything that gets replaced during the shutdown. See plant shutdowns.
Yes: structures, tanks, piping, supports and equipment for brine plants. See inside a lithium plant.

Reverse engineering and commissioning

Yes. We survey the machine or the part with calipers, micrometers or a 3D scanner, model it in 3D, produce the drawings and build the copy, an improved version or the spare parts nobody sells anymore. See industrial reverse engineering.
Yes, from the original part, even worn or broken: it is measured, wear is compensated, the material is identified by hardness or spectrometer, and the part is made. How it works is in spare parts without drawings.
Generally yes, when it has no patent or utility model in force in Argentina. Brands, logos and the PLC program are not copied: they are redesigned. We check before every job; the details are in what you can legally copy.
Yes, even when the supplier never came: inventory of what arrived, foundations and leveling, power, air, water and gas hook-ups, fabrication of whatever is missing, and start-up from cold checks to no-load to full load. See machinery installation and commissioning.
Yes. A local engineer verifies the structure for the wind, snow and seismic loads of the site under Argentina's CIRSOC codes, foundations and anchor bolts get resolved, and missing or damaged members are fabricated in our plant. More in erecting steel building kits.
Bearings with hardened grease, seals, belts and hoses, the hydraulic oil, the panels, the PLC battery that keeps the program and the capacitors in the drives, all before applying power. The full list is in what to check before starting a machine idle for years.

Ask us directly

Did not find your answer? Send us the question — we reply fast, in English or Spanish.