The soil decides, not the budget. On a ground-mount solar structure, what goes below grade can weigh as much in the job as what you see above it, and the choice between driving piles and pouring concrete is made by the ground. That is the conclusion. The why follows.

Driven piles are the fast option. A machine drives galvanized steel posts straight into the ground, with no digging and no concrete, and the job moves very quickly. It works in soils that can be penetrated and that hold the post by friction: dense sands, silts, firm clays. It does not work the same way in rock, in soils full of cobbles, or in loose fill.

That is why, before deciding, two things get done. A geotechnical study. And pull-out tests on site: test piles are driven and pulled upward and sideways to see what they really hold. Those numbers set the embedment depth. Without them, you are guessing.

When concrete goes in

Concrete foundations — short piers, spread footings or blocks — show up where driving cannot: rock, very hard or very loose soils, ground where you should not penetrate, such as fill or contaminated land, where ballast blocks are used, or small installations where bringing in a pile driver does not pay. They are slower and need more civil work, but they work on almost any ground. On industrial roofs the problem is different: there is no foundation, there are purlins, and the structure adapts to them.

Between the two extremes there are middle options. Helical piles, screwed into the ground like a bolt, go in fast, need no concrete and can be removed. And in rock, a hole is sometimes pre-drilled before the post is driven or anchored. The pull-out test applies to all of them: it is what tells you which one holds.

And one thing that depends not on the soil but on the crew: tolerance. The racking kit arrives cut and drilled; if a post ends up out of plumb, too high or off its line, the structure will not fit and someone ends up drilling in the field, which is exactly what ruins the galvanizing. Good pile driving is as precise as good cutting.

There is one point people forget. Corrosion below grade. The buried length of the post lives in different conditions from the part above, and soil aggressiveness — moisture, salts — sets how much galvanizing it needs. The soil study serves for that too, and for warning about a high water table or expansive soils, which change the embedment depth. In cold regions, the post also has to go below the depth at which the ground freezes.

We fabricate the structure in series to the project engineering, hot-dip galvanized and labeled, as described in solar mounting structures and in the guide to steel structures for solar panels; finishes are explained in paint, galvanizing or epoxy, and the parts come off our CNC laser cutting.

Send us the soil study and the engineering, and we will return an open steel takeoff, piece by piece, so you can compare with no surprises. Reach us at Indumor.

← Back to the Knowledge Hub

Keep reading

Have the soil study?

Send it with the engineering and we will return an open steel takeoff.